Track + Field Stadium Commissioning

Texas A&M University - College Station
Client

Texas A&M University – College Station

Market

Higher Education

Year Completed

2019

This project included recommissioning of 60 separate facilities. The quality control measures used to complete the project included construction phase MEP document review, prefunctional equipment testing inspections, OEM factory start up witness for major MEP systems and submittal checking against Texas A&M design standards and HVAC system sequences of control.

The energy saving measures of the project included 4-6 percent annual savings of daylight harvesting controls, 6-8 percent annual savings of outdoor air system energy recovery and 2-4 percent annual savings of high performance building envelope.